|
Unexploded Ordnance/Explosive Remnants of War - Services We feel that our approach and quality exceeds industry standards meaning significant benefits are passed to our clients. Our agile delivery enables us to provide a bespoke service for all variations of projects and clients. 6 Alpha Associates have both the capability and capacity to offer its clients the following services: United Kingdom (UK) and European Countries | Rest of World | Specialist tasks
For sites contaminated with both Unexploded Ordnance (UXO) and Explosives (Typically for sites in the United Kingdom (UK) & European Countries). Phase One – Desk-Based Threat & Risk Consultancy
• Initial Site Screenings • Risk Assessments & Detailed Risk Analysis • Major Development Detailed UXO Risk Zoning • Holistic Threat & Risk Assessments • Geographical Information System (GIS) historical data collation and analysis.
Phase Two – Risk Mitigation Strategy
• Risk Mitigation Strategy Design • Operating Guidelines • Survey Design • Equipment Verification • Technical Specification • Quality Assurance / Quality Control (QA/QC) Plan • Development of Emergency Response Plan
Phase Three - Project Management
• Production and Management of Invitation to Tender (ITT) / Request for Proposals (RFP) • Quantitative Contractor Selection Assessment • QA/QC of contractors • Project sign-off International sites that have been contaminated with post conflict Explosive Remnants of War (ERW) (Typically for sites in the Rest of the World). Phase One - Threat & Risk Consultancy
• Risk Assessments & Detailed Risk Analysis • General Mine Action Assessment (GMAA) • Oil & Gas Concession Area Risk Screening • Holistic Threat & Risk Assessment • Level One – Technical Surveys • Production of Geographical Information System (GIS) Risk Overlay and Database
Phase Two – Risk Mitigation Strategy
• Risk Mitigation Strategy Design • Operating Guidelines • Preparation of Mine Clearance Plans • UXO Survey Design • Equipment Procurement and Verification • Technical Specification • Quality Assurance / Quality Control (QA/QC) Plan
Phase Three - Project Management
• Production and management of Invitation to Tender (ITT) / Request for Proposals (RFP) • Quantitative Contractor Selection Assessment • Project sign-off
Phase Four – Site Consultancy
• QA/QC of Battle Area Clearance (BAC) and Mine Clearance operations • Mine Risk Education (MRE) • Explosive Ordnance Disposal (EOD) Training • Seismic and Archaeology survey safe-guarding
Specialist Tasks • Expert Witness
• Industry Best Practice Technical Manuals and Guidelines. Notably, 6 Alpha has significantly contributed to a report by the Construction Industry Research & Information Association (CIRIA) (link) which aims to help the industry assess and mitigate UXO risks, in the construction/civil engineering environment.
|